The Challenge
For this challenging task CITO Transport started the planning phase all the way back in June 2019.
There is a number of issues in transporting wind turbines; the size of it makes them prone to damage and breakage during transport and they have to be kept as static as possible during transport.
Our task was to:
- Move the parts belonging to 19 wind turbines with zero damage and efficient use of space
- Do so in a timely manner, with zero damage and minimal movement